The Beer Chronicles

All about beer

List of equipments required during microbrewery set up

leave a comment »

In the last post we discussed about the various questions to be answered when it comes to equipment selection in microbrewery. We discussed whether we should use new or old equipment. If we are using new equipment what all things to consider before placing order for equipments. In this post we shall discuss about the various kind of equipement
required in microbrewery.

Here we will discuss the main equipment required for a 1000l/batch Microbrewery. This is not a complete list but it covers the major equipment requirement. I have categories the equipment based on their functioning. These caterogies are – Mash System, Fermentation system, Cooling system, Filter system, Controlling system and Cleaning system.

The equipments required under these categories are mentioned below:

Mash System

  • Mash tank
  • Lauter tun
  • Electric stream generator
  • microbrewery equipment list

  • Malt mill machine
  • Wort pump
  • Plat heat exchanger
Fermentation system
  • Fermentation tank
  • Yeast adding equipment
  • Cooling pump
Cooling system
  • Ice liquid tank
  • Refrigeration machine
Filter system
  • Filter diamite tank
  • Pump
Controlling system
  • Meter controlling board
  • Regerator board
  • PLC controll board
   Cleaning system
  • Sterilize tank
  • Alkali liquor tank
  • Washing pump
Feel free to get in touch with me in case you require information related to equipment, costing or any other information about microbrewery set up.
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: